It feels like the brakes have been put on.  Between my dad's vacation, Pete's out of town & overtime work requirements and our builder's other jobs, not much has been done at the house lately.  It's looking less and less likely that we'll make our end of March move in goal.  Oh well...all projects take more time and money than expected right?
Here are a few pictures of what we've accomplished in the past week:
While Pete was out of state for work, I laid and grouted the 2nd bathroom floor.  Practice makes perfect - this was my best tile job yet. : )

I also "red guarded" the master shower.  Red Guard is a water proofing product that applies like paint on cement board.  It's in place of a plastic liner.

We finally pulled the trigger on tile for the master shower.  The white tiles are rectangular and will be on the walls.  The square brown tiles are for the floor, ceiling, curb and threshold.  The greenish glass tile will wrap around as an accent.

We have two working toilets!!  (And one shower curtain : )

The 2nd bathroom vanity, top, faucet and hardware have been set.

Pete replaced the 2nd bath light fixture.

Some of the doors are trimmed and the trim is painted.  This view is looking into the master bedroom.  The first door on the right is the master bath and the second door is the master closet.

The wine rack has arrived!!  (You have to picture this slid up into the hole directly above it.)